Pilbara Transmission Project – Kanyirri Substation

2025

Client: Resource Services Group X (RSGx)

Civil construction of Kanyirri Substation
  • Construct 52 x in-situ concrete footings and 1 x transformer slab for new switchyard
  • Detailed earthworks for footings, slabs, culverts, pits etc. within the switchyard
  • Approx. 2km of trenching and conduit installation
  • Construct in-situ cable jointing pit and 66kV cable take off pole foundation outside switchyard area
  • Culverts and drainage
  • Detailed earthworks
  • Final trim of site and installation of crushed aggregate surfacing